TEST REPORT
TECHNICAL SUPPORT
DEVELOPING PRODUCTS

 
 
 
LOCATION : HOME - DATA BASE
Test Report of Anti-riot suit
     ADD TIME£º2007-11-27 13:48:18
 
Pubic police inspection NO.065258
 
 
              
INSPECTION  REPORT
  
 
Product name: riot suit
Specification of the type: FBF-S
Inspection category: model inspection
Report date: October 20th 2006

 Ministry of public security special police equipment quality supervision inspection center

Public police inspection NO.065258                                                     total page: 6  no. 1

Product name and type
FBF-S  riot suit
Sampling date
October 16th 2006
Sampling place
factory
Base number
600 sets
Sample quantity
2 sets
Batch number
  06-01
checker
Wang Lizhu
Inspection base
     GA- 422-2003 riot suits
N/A
Inspection date
 October 18th 2006 ¨C October 20th 2006
Inspection conclusion
Through inspection the sample of FBF-S riot suits .The inspection conclusion was fulfill the stipulated with <<GA 422-2003 riot police shield>>.

 

Public police inspection NO.065258                                                     total page:6    no.2

     Inspection place  Inspection environment  Inspection equipment
Inspection place (include items and sport check )
Ministry of security special police equipment quality supervision inspection center
N/A
Inspection environment (special environment demands)
Indoor: temperature 25* C  humidity 40%RH  atmospheric pressure 1005hPa
N/A
 
 
 
Main inspection equipment
          
          Domestic  general standard measure
          Domestic   common hand machine
          American  INSTRON 4204 pull testing machine
          Domestic   drop hammer impact testing machine
          Domestic   electronic weigh
          Domestic   high -temperature text chamber
          Domestic   low-temperature text chamber
          Domestic   level upright burning tester
          Domestic   oxygen instrument 
          
 
 
Describe of inspection samples
 
 Riot suit consist of chest, abdomen,, crotch, upper limbs, lower limbs and so on protect parts. Prothorax use thick foam 1.5mm, 1mm pc ban, 4mm foam loyer2, 2mm thick aluminum sheet overlapping, 2mm felt, back use 4mm foam loyer2 molding, 2mm aluminum sheet overlapping, foam and so on ; limb protection course use molding armor and soft absorb energy material .
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Public police inspection NO.065258                                                     total page: 6    no.3

Inspection items   Inspection results
Serial number
Inspection items
Technical(standard) demand
Sample number
Inspection result
judgment
1
Outline inspection
Riot suit have no gauffer,  rift, dilapidation, gap, unstitch, drop needle, thrum and so on
 
 
 NO.1-NO.4
 
 
Meat demand
 
 
 P
2
Quality inspection
Riot suits total qualities are not less than 8.5kg
 NO.1
6.5kg
 P
3
Dress flexibility inspection
It must be dress flexibility, easy to get of ,it can not obvious limited arms free motion and genuflect, jump, squat, run, pitching, swivel
 
 
 
 NO.1
 
 
 
Meat demand
 
 
 
 P
4
Protect area inspection
chest, abdomen,, crotch,
Large-size : >0.26sq.m
 
 
 
 
 
 NO.1
 
 
 
 
Meat demand
 
 
 
 
 P
Back
Large-size : >0.14sq.m
upper limbs
Large-size : >0.26sq.m
lower limbs
Large-size : >0.42sq.m
5
Structure connect strength inspection
Button strength : >300N
Nylon fibulae : >120N
Connective band mightiness : >2200N
Other parts connect strength : >250N
 
 
 NO.1
Give the stipulated force value on the connecting  fitting ,all can meat demand
 
 
P
6
Prevent thorn performance inspection
Use standard text cutter for prothorax, back, abdomen, crotch, 20J kinetic energy, upright pierce into armor coat, knifepoint can not through armor coat
 
 
 
 NO.1
 
 
 
Meat demand
 
 
 
 P
           P=pass   F=fail   N=un-inspection  A=allow

 

Public police inspection NO.065258                                                    total page: 6    no.4

Inspection items   Inspection results
Serial number
Inspection items
Technical(standard) demand
Sample number
Inspection result
judgment
7
Shockproof performance inspection
Put any protect parts of the suit on the face of rigidity use 20J kinetic energy the parts will not dilapidation craze
 
 
 NO.1
 
 
Meat demand
 
 
 P
8
Impact energy absorb performance inspection
Lay the prothorax back parts of the suit on the standard plaster, use 100J kinetic energy the deep of plaster impress can not exceed 20mm
 
 
 
 NO.1
 
 
 
Meat demand
 
 
 
 P
9
High-temperature prevent thorn inspection
Let riot suit put into +55*C+2*C thermo tank keep it for 4h, then going on prevent text, the result must be demand the request of prevent performance
 
 
 
 
 NO.2
 
 
 
 
Meat demand
 
 
 
 
 P
10
High-temperature shockproof performance inspection
Let riot suit put into +55*C+2*C thermo tank keep it for 4h, then going on shockproof  text, the result must be demand the request of shockproof performance
 
 
 
 
 NO.2
 
 
 
 
Meat demand
 
 
 
 
 P
 
P=pass   F=fail  N= un-inspection  A=allow
 

 

Public police inspection NO.065258                                                    total page: 6    no.5

Inspection items   Inspection results
Serial number
Inspection items
Technical(standard) demand
Sample number
Inspection result
judgment
11
low-temperature prevent thorn inspection
Let riot suit put into -20*C+2*C thermo tank keep it for 4h, then going on prevent text, the result must be demand the request of prevent performance
 
 
 
 NO.2
 
 
 
Meat demand
 
 
 
 P
12
low-temperature shockproof performance inspection
Let riot suit put into -20*C+2*C thermo tank keep it for 4h, then going on shockproof  text, the result must be demand the request of shockproof performance
 
 
 
 NO.2
 
 
 
Meat demand
 
 
 
 P
13
Protection course fire resistance property inspection
Use Bunsen burner going on resistance text of protection course, let luminous tube and sample became 45* corner, the distance of luminous tube top and sample is 10mm, control high of the Bunsen burner blue flame is 20+2mm,move the Bunsen burner when fire 10 minutes, sample burning time will not exceed 10s
 
 
 
 
 
 
 
 
 NO.1
 
 
 
 
 
 
 
 
Meat demand
 
 
 
 
 
 
 
 
 P
 
P=pass   F=fail  N= un-inspection  A=allow
 

 
 
Public police inspection NO.065258                                                    total page: 6    no.6

Inspection items   Inspection results
Serial number
Inspection items
Technical(standard) demand
Sample number
Inspection result
judgment
14
Surface course oxygen index inspection
According to the standard stipulated ,surface course oxygen index can not less than 28%,contral the flow of oxygen is 3.19L/min, the flow of alkaline air is 8.21L/min: damping the sample 58x150mm then fixed in the specimen holder, ignite the sample ,burning time must central in 10-15s ,move the ignite ,write down the continue burning and smolder, in 2 min continue burning and smolder mar length can not exceed 40mm
 
 
 
 
 
 
 
 
 
 
 
 
 NO.1
 
 
 
 
 
 
 
 
 
 
 
 
Meat demand
 
 
 
 
 
 
 
 
 
 
 
 
 P
 
P=pass   F=fail  N= un-inspection  A=allow